Design of Iron, Manganese and Ammonia removal oxidation tower
ecord

Course Outlines

  • Introduction to underground water quality
  • Packed column theory
  • Design criteria for Oxidation Tower
  • Design procedures of Packed Column
  • Packed column design for Mn , Fe and NH3 removal
  • Design of pre and post treatment for PC plant
  • Codes and Standards for PC design

Course language

  • will be Bilingual (English/Arabic)

Course Program

The following program is planned for this course. However, the course instructor(s) may modify this program during the course for technical reasons or participants feedback with no prior notice to participants. Nevertheless, the course objectives will always be met:

The training course will be limited to Three (03) Days full time (From 08:00 am to 13:00am).

Code Total Dates Venue
WT520 30 Hrs 2015-01-04 Four seasons Hotel – Alexandria Egypt