Training Program 2019
ecord

January 

Code Program Title Total hrs. Dates Venue
NE700   Urea handling and ship loading: Design configurations, Operation, Maintenance & Repair 5 Days (30 hrs.)   Dubai
WE530 Electro-mechanical equipment for waste water treatment plant 5 Days (30 hrs.) Jan 19-22 Sharm- Elshiek
ME400 Centrifugal Pumps: Operation, Maintenance,  Troubleshooting, Inspection, and Repair   5 Days (30 hrs.) Jan 19- 29 Istanbul

February 

Code

Program Title

Total hrs. Dates Venue
WN700 Water Distribution Networks Planning, Design, operation, maintenance and troubleshooting 5 Days (30 hrs.) Feb  01-05 Istanbul
WD220   Multi-Effect Distillers MED Desalination (MED-TVC&MED-MC): Design, Operation, Maintenance &Troubleshooting) 5 Days (30 hrs.) Feb  08-12 Sharm- Elshiek
WN550 Water pumping stations: operation, maintenance and troubleshooting   5 Days (30 hrs.) Feb  15-19 Istanbul
WD210 Multi Stages Flash Technology (MSF): Design, Operation, Maintenance & Troubleshooting 5 Days (30 hrs.) Feb  22-26 Istanbul

March 

Code Program Title Total hrs. Dates Venue
WD200 Water Distribution systems: Execution, interaction with other utilities, operation, maintenance and troubleshooting 5 Days (30 hrs.) Mar 01-05 Istanbul
WE510 Electro-mechanical equipment design for water treatment plant 5 Days (30 hrs.) Mar  08-12 Sharm- Elshiek
WD230 Reverse Osmosis Desalination Technology (RO): Operation, Troubleshooting, Maintenance 5 Days (30 hrs.) Mar 15-19 Alexandria
ME200 Gas Turbine: Operation, Maintenance & Troubleshooting 5 Days (30 hrs.) Mar 22-26 Alexandria

April 

Code Program Title Total hrs. Dates Venue
WN 050 Building Potable Water Pipe Inspection 5 Days (30 hrs.) April 5-9 Dubai
WN 040 Operational Problems of Water Distribution Network 5 Days (30 hrs.) April 12- 16 Sharm- Elshiek
WT380 Oily wastewater treatment plant: Design and Technologies 5 Days (30 hrs.) April 26- 30 Alexandria

May 

Code Program Title Total hrs. Dates Venue
WD200 Water Desalination Technologies 5 Days (30 hrs.) May 3-7 Alexandria
NE700   Urea handling and ship loading: Design configurations, Operation, Maintenance & Repair 5 Days (30 hrs.) May 10-14 Dubai
WE530 Electro-mechanical equipment for waste water treatment plant 5 Days (30 hrs.) May 17-21 Sharm- Elshiek
WD230  Reverse Osmosis Desalination Technology (RO): Operation, Maintenance and Troubleshooting 5 Days (30 hrs.) May 24-28 Alexandria

June

Code Program Title Total hrs. Dates Venue
WN700 Water Distribution Networks Planning, Design, operation, maintenance and troubleshooting 5 Days (30 hrs.) June 7-11 Dubai

July 

Code Program Title Total hrs. Dates Venue
WD220   Multi-Effect Distillers MED Desalination (MED-TVC&MED-MC): Design, Operation, Maintenance &Troubleshooting) 5 Days (30 hrs.) July 26-30 Sharm- Elshiek

August 

Code Program Title Total hrs. Dates Venue
WD230 Reverse Osmosis Desalination Technology (RO): Operation, Troubleshooting, Maintenance 5 Days (30 hrs.) August 2-6 Alexandria
WN550 Water pumping stations: operation, maintenance and troubleshooting   5 Days (30 hrs.) August 9-13 Istanbul
WD200 Water Distribution systems: Execution, interaction with other utilities, operation, maintenance and troubleshooting   5 Days (30 hrs.) August 16-20 Dubai
WE510 Electro-mechanical equipment design for water treatment plant   5 Days (30 hrs.) August 23-27 Sharm- Elshiek

September 

Code Program Title Total hrs. Dates Venue
WD210 Multi Stages Flash Technology (MSF):  Design, Operation, Maintenance & Troubleshooting   5 Days (30 hrs.) September 6-10 Istanbulb
ME200 Gas Turbine: Operation, Maintenance & Troubleshooting   5 Days (30 hrs.) September 13-17 Alexandria

October 

Code Program Title Total hrs. Dates Venue
NE700   Urea handling and ship loading: Design configurations, Operation, Maintenance & Repair 5 Days (30 hrs.) Oct 18- 22 Dubai
WD200 Water Desalination Technologies 5 Days (30 hrs.) Oct 25-29 Alexandria

November 

Code Program Title Total hrs. Dates Venue
ME400 Centrifugal Pumps: Operation, Maintenance, Troubleshooting, Inspection, and Repair   5 Days (30 hrs.) Nov 8- 12 Istanbul
WN700 Water Distribution Networks Planning, Design, operation, maintenance and troubleshooting 5 Days (30 hrs.) Nov 15-19 Dubai
WD220   Multi-Effect Distillers MED Desalination (MED-TVC&MED-MC): Design, Operation, Maintenance &Troubleshooting) 5 Days (30 hrs.) Nov 22-26 Sharm- Elshiek
WD230 Reverse Osmosis Desalination Technology (RO): Operation, Troubleshooting, Maintenance 5 Days (30 hrs.) Nov 29-3 Alexandria

December 

Code Program Title Total hrs. Dates Venue
WN 050 Building Potable Water Pipe Inspection 5 Days (30 hrs.) Dec 6-10 Dubai
WN 040 Operational Problems of Water Distribution Network 5 Days (30 hrs.) Dec 13-17 Sharm- Elshiek
WN550 Water pumping stations: operation, maintenance and troubleshooting   5 Days (30 hrs.) Dec 20-24 Istanbul
WD200 Water Distribution systems: Execution, interaction with other utilities, operation, maintenance and troubleshooting   5 Days (30 hrs.) Dec 27-31 Dubai